
New construction homes in Campbell! See trailblazerpl.com for more information. Two options for buying: Option 1 buy the lot at 1.54M with approved permit plan, and build with experienced construction team at the cost around 1.2M. Option 2 Buy the future completed new construction home at 2.93M. Buyer still has time to change design materials. Welcome to the epitome of modern living in this stunning two-story new construction home (to be completed in July 2024). With 2,682 living sqft of 4 bedrooms and 3 bedrooms, this home provides plenty of room for everyone to enjoy their own space and gather together comfortably. The house is situated in a desirable location near Westmont Athletic Stadium, Pruneyard Shopping Center and Historic Downtown. Great schools, Forest Hill Elementary, Rolling Hills Middle, Westmont High(buyer to verify).
ML81930348
Single Family, 2 Story
4
Santa Clara
3 Full
2023
0.1588
Acres
Water: Public
2
Sewer: Sewer - Public
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...