
New construction homes in Campbell! See website at trailblazerpl.com for more info. Two options for buying: Option 1 buy the lot at 1.74M with approved permit plan, and build with experienced construction team at the cost around 1.3M. Option 2 Buy the future completed new construction home at 3.13M. Buyer still has time to change design materials. Welcome to the epitome of modern living in this stunning two-story new construction home (to be completed in July 2024). With 2,447 living sqft of 4 bedrooms and 3 bedrooms, and an additional 401sqft ADU of 1bedroom and 1bathroom on the first floor, this home provides plenty of room for everyone to enjoy their own space and gather together comfortably. The house is situated in a desirable location near Westmont Athletic Stadium, Pruneyard Shopping Center and Historic Downtown. Great schools, Forest Hill Elementary, Rolling Hills Middle, Westmont High(buyer to verify).
ML81930352
Single Family, 2 Story
5
Santa Clara
4 Full
2023
0.1498
Acres
Water: Public
2
Sewer: Sewer - Public
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...